How bad is our leaks problem?
The region's drinking water network is largely 30-100 years old and made up of 2,543km of pipeline (that’s the equivalent distance of flying from Wellington to Sydney).
Over time pipes, valves and fittings start to wear and tear, and leaks can form around the network. Almost all the water pipes are buried so finding leaks that don’t come to the surface is hard.
Estimates indicate that the overall average water loss from July 2023 and June 2024 was 41% of the total amount of drinking water supplied in the Metropolitan Wellington region, a slight reduction from 44% in the previous financial year. We cannot accurately track current water loss without universal metering.
This figure includes both public and private leaks and highlights the ongoing challenges we face.
Essentially, the water pipes in the region are aging at a faster rate than we can replace them – old pipes burst and leak more often and some of the pipes in our region are 100 or more years old.
For the latest leaks numbers, check out Leaks by the Numbers.
How we prioritise leaks
Wellington Water, on behalf of our council owners, has dedicated teams out finding and fixing leaks every day. But there are a lot of leaks out there and we simply can't fix them all. So, we must prioritise where our crews go to make the best use of our resources and focus on fixing the biggest leaks that have the most impact on water supply. Many of which are underground and not easy to spot.
The leaks that meet the criteria for 'urgent priority' leaks jump to the top of the list and are dealt with first. This means that small 'low priority' leaks such as a leaking toby will be deferred for attention later, when resources allow.

What Wellington Water is doing about leaks
Wellington Water has clear direction to work with councils to address this water loss and leaks as a priority. As a region, we want to avoid having to put in place tighter water restrictions over summer or ask residents to reduce their usage at short notice, which may be the case if we can’t sufficiently reduce the level of water use and leaks.
The recent reduction in water loss reflects increased funding from our councils and enhanced leak repair efforts, which began in late January 2024. We anticipate further reductions in annual water loss as we continue to monitor our progress.
The total number of open leaks has decreased by approximately 57% over the past eight months, from over 3,000 in January 2024 to 1,261 as of August 26, 2024. It's important to note that only 664 of these leaks are on the public network, highlighting the need for residents to address leaks on their properties as well.
There are more leaks than we can fix in the short term, so we focus on finding and fixing the most significant leaks in the public network. The biggest leaks tend to be underground losing 40 litres or more a minute and are not visible to the public. This means the smallest leaks, which are quite often bubbling to the surface may take us longer to get to.
Picture: Priority One Leak

To do this we have come up with a clear prioritisation process to ensure our work is as effective as possible. The leaks that meet the criteria for 'urgent priority' leaks jump to the top of the list and are dealt with first. This means that small 'low priority' leaks such as a leaking toby will be deferred for attention later, when resources allow.
Monthly fixed leaks
Maintaining Wellington's aging public water network is challenging.
We have to focus our efforts and resources on the biggest leaks that have the most impact on water supply. This ensures we’re saving the most water we can.
Each month, we provide an update on our progress to get the leaks backlog down to a sustainable level here.