We're anticipating higher-than-usual call volumes. While our team is working hard to assist everyone as quickly as possible, you may experience longer wait times.

Still waiting?

Still waiting to receive your first water services bill?

Get in touch to request a copy
Contact us
Water Networks / Projects / Projects / Bellevue Horokiwi Wastewater Renewal

Bellevue Horokiwi Wastewater Renewal

On behalf of Wellington City Council, we are replacing a wastewater pipe which runs between the Bellevue subdivision in Newlands and SH2.
Overview
Contact:

If you have any questions about this work, please contact:

Wellington Water, 04 912 4400

An existing wastewater pipe which runs down the slope from Newlands to State Highway 2 is at risk of slipping and requires replacement. 

 

To address the risk, on behalf of Wellington City Council, Wellington Water are designing a replacement suspended pipe bridge to minimize the risk of future failures, prevent wastewater overflows into the harbour, and increase the resilience of the wastewater network.  

 

Works are expected in early 2026.