We're anticipating higher-than-usual call volumes. While our team is working hard to assist everyone as quickly as possible, you may experience longer wait times.

Still waiting?

Still waiting to receive your first water services bill?

Get in touch to request a copy
Contact us
Water Networks / Projects / Projects / Regional Pressure Management Programme

Regional Pressure Management Programme

Overview
Current status
Background

Water pressure management reduces water use and loss. It extends the life of pipes and reduces new leaks, helping keep water in the pipes and reduce demand

Contact:

If you have any questions about this work, please contact:

Wellington Water, 04 912 4400

Tiaki Wai has a regional programme to plan and implement water pressure reduction on behalf of councils.

Planning is underway for pressure reduction and monitoring in multiple suburbs across Wellington City, Lower Hutt, Upper Hutt and Porirua.  

We're currently preparing to install two new flow meters in Mungavin Avenue & Champion Street (Cannons Creek, Porirua). This helps us manage water pressure more effectively, by improving our monitoring and control of two existing pressure control valves. 

We are then applying water pressure reduction in parts of Miramar, Wellington and Upper Hutt. This work is scheduled to take place in the 2026/27 financial year, pending final design checks. We will provide more details on this work soon. 

Please see the ‘background’ section for our full schedule of works. 

The purpose of the regional pressure management programme is to achieve more efficient water use. We want water pressure to be at the right level for use in homes and businesses (including for firefighting purposes), but we don’t want the pressure to be higher than it needs to be.  

 

We use modelling techniques and water pressure testing out in the field to understand where pressure is right, and where it’s too high. We then apply pressure reduction in areas where it’s too high. We prioritise areas where we can achieve the highest volume of water savings in the most efficient way.  

 

The programme will play an important role in conserving water, and delivering value for money to ratepayers by:  

  • Reducing leakage in the water network  

  • Extending the life on water pipes and other infrastructure  

  • Reducing the number of pipe bursts  

 

Water pressure varies across the region, depending on a range of factors such as location and elevation. Having pressure management valves that are operational and in good working order is another key factor. 

Upcoming works schedule   

 

Here’s our schedule of work coming up. This is an indicative plan which might change depending the results of investigations such as pressure tests and the location of other services like gas, fibre etc. 

    

Package One (2026/27) 

Package Two (2026-27) 

Package Three (2027-28) 

 

Package Four (From 2028) 

Flow Meter Installation, Mungavin Ave & Champion Street, Cannons Creek, Porirua

Miramar, Wellington 

Kelburn, Wellington

 

Alicetown, Lower Hutt 

 

Norana Road, Norbert Street, and Fergusson Drive/Main Road North, Upper Hutt 

Moohan & Bledisloe Street, Wainuiomata, Lower Hutt 

 

Holborn Drive, George Street and Stokes Valley Road, Lower Hutt

 

 

Riverstone Terraces, Upper Hutt

Eastbourne, Lower Hutt

 

 

Trentham, Upper Hutt 

Manor Park, Upper Hutt 

 

 

 Waitangirua, Porirua  

 

  • Note: Package 4 is pending funding approval. 
  • The above schedule is indicative only, and subject to change depending on investigation findings.