Moa Point Investigation Report

The Moa Point Investigation Report is an independent technical investigation into the flooding event at the Moa Point Wastewater Treatment Plant on 4 February 2026. It was prepared for Wellington Water by AECOM, a leading water infrastructure consultancy. The report focuses on the technical aspects of the event and the factors that contributed to it.

Moa Point Investigation Report

Appendices

Appendix A - FENZ Incident Report
Appendix AA - Weekly Progress Meeting Minutes Recording PLC Modifications (20260109)
Appendix B - Moa Point - Flood recovery - Action Log
Appendix BB - Minutes of Offline UV Channel Overflow Events (WWA.MOA.01.063554)
Appendix C - Req 3.1 Veolia Staff_Contracted workers between 00:00 2nd Feb - 12:00 4th Feb
Appendix D - AECOM Hazard Analysis Register
Appendix DD - SCADA Alarm Register (Highlights Made by AECOM)
Appendix E - 03422-310-FD-001 Moa Point WWTP Functional Description V1.1
Appendix EE - Alarm List from PLC - SCADA - MCC Renewal Contract Documents
Appendix F - Anglian Water Design Report + Appendicies
Appendix FF - Draft Functional Description from PLC - SCADA - MCC Renewal Contract Documents
Appendix G - Wellington Ocean Outfall Design Report
Appendix GG - Letter from Veolia to GWRC
Appendix H - Guidance for Capex Project Delivery
Appendix HH - Moa Point WWTP Hydraulics Modelling Report
Appendix I - UV Contract
Appendix II - 7.284-M-001-V2 - Moa Point Pipelines Study
Appendix J - Stantec UV Project Design + Build Phase Engagement (V1)
Appendix JJ - 310103580-PR-MO01 - Moa Pt STP Hydraulic Constraints
Appendix K - Veolia Short Form Agreement - UV Project (Signed)
Appendix KK - TEM-13241 Wellington Regional Wastewater Treatment Plant Risk Register 2024
Appendix L - UV Project AEE (WWA.MOA.01.054916)
Appendix LL - Filtec Redacted Report Comments Register REV B_(AECOM Response)
Appendix M - 10719 ARD-REG-005 - D&C Phase Risk Register - Updated Oct 2025
Appendix MM - Veolia Redacted Report Comments Register REV B_(AECOM Response)
Appendix N - Moa Point Safety in Design Risk Assessment Rev A Jan 2025 - Filtec closed actions 
Appendix O - HAZOP_Moa_Point_UV_Upgrade_Rev_0.3 - Feltec Responses 18.03.25
Appendix P - Moa Point WWTP UV Channel 1 Shutdown Plan Filtec - 1 October 2025 - Rev 2
Appendix Q - Moa Point UV Channel 1 Shutdown Plan - Appendicies
Appendix R - WWL Shutdown Request Process
Appendix S - CN 738.0001 Moa Point PCBU Risk Meeting Minutes 20250919
Appendix T - CN 738.00001 Pre-Construction Meeting Minutes 20250922
Appendix U - Weekly Progress Meeting Recording Go, No-Go (20250925)
Appendix V - Channel 1 Isolation Permit to Work VEOLIA PTW - W1008343472
Appendix W - 21 and 28 October 2025 Inundation Event (WWA.MOA.01.059711)
Appendix X - 10719 Moa Point - over flow incident 15.01.26 R2
Appendix Y - 27 January 2026 Inundation Event (WWLMOA.01.008388)
Appendix Z - Overflow to isolated channel - 3 February Inundation Event Incident Report

Redactions

This table sets out the grounds for redactions in each of the appendices 

Appendix  Withholding ground(s) under LGOIMA
Appendix A – FENZ Incident Report  This report was released by Fire and Emergency New Zealand to AECOM under the Official Information Act 1982 (OIA), with redactions under ‘out of scope’ and for personal information under section 9(2)(a) under the OIA. The version provided in the appendix is as was provided to AECOM.  
Appendix AA – UV Project Progress Meeting Minutes - PLC Programming Changes  Personal information withheld under section 7(2)(a).
Appendix B – Veolia Flooding Incident Event Log Personal information withheld under section 7(2)(a). 
Appendix BB – Minutes of UV Channel Inundation Events Meeting    Personal information withheld under section 7(2)(a). 
Appendix C – Veolia Personnel Log 3 and 4 February 2026 Personal information withheld under section 7(2)(a). 
Appendix CC – Transcript of 3 February 2026 Meeting    This document is withheld in its entirety under section 7(2)(f)(i).  
Appendix D – Hazard Analysis Register       No information withheld.
Appendix DD – SCADA Alarm Register  No information withheld.
Appendix E – PLC, SCADA and MCC Renewal Functional Description  Personal information withheld under section 7(2)(a). 
Appendix EE – Alarm List from PLC/SCADA/MCC Renewal Contract Documents    No information withheld.
Appendix F – Anglian Water Design Report    Personal information withheld under section 7(2)(a). 
Appendix FF – Draft Functional Description from PLC/SCADA/MCC Renewal Contract Documents  Personal information withheld under section 7(2)(a). 
Appendix G – Wellington Ocean Outfall Design Report  Personal information withheld under section 7(2)(a).
Appendix GG – 2013 Flooding Incident Letter    Personal information withheld under section 7(2)(a). 
Appendix H – Guidance for Capital Project Delivery    No information withheld. 
Appendix HH – Moa Point WWTP Hydraulics Modelling Report Personal information withheld under section 7(2)(a). 
Appendix I – UV Renewal Design and Construct Contract  No information withheld. 
Appendix II – Moa Point Pipelines Hydraulic Study  Personal information withheld under section 7(2)(a). 
Appendix J – Stantec UV Project Design + Build Phase Engagement    Personal information withheld under section 7(2)(a). 
Commercially sensitive information withheld under section 7(2)(b)(ii). 
Appendix JJ – Clarifier Hydraulic Constraints Assessment  Personal information withheld under section 7(2)(a).  
Appendix K – Veolia Moa Point Short Form Engagement – UV Project Personal information withheld under section 7(2)(a). 
Appendix KK – Veolia WWTP Operations Risk Register Personal information withheld under section 7(2)(a). 
Appendix L – UV Project Assessment of Environmental Effects Personal information withheld under section 7(2)(a). 
Appendix LL – Filtec Redacted Report Comments Register Personal information withheld under section 7(2)(a). 
Appendix M – UV D&C Phase Project Risk Register  No information withheld. 
Appendix MM – Veolia Redacted Report Comments Register  No information withheld.
Appendix N – UV Project SiD Register  Personal information withheld under section 7(2)(a). 
Appendix O – UV Project HAZOP Register  Personal information withheld under section 7(2)(a). 
Appendix P – UV Channel Shutdown Plan  Personal information withheld under section 7(2)(a). 
Appendix Q – UV Channel Shutdown Plan Appendices  Personal information withheld under section 7(2)(a). 
Commercially sensitive information withheld under section 7(2)(b)(ii) 
Appendix R – Wellington Water Shutdown Request Process  Personal information withheld under section 7(2)(a). 
Appendix S – UV Project PCBU Risk Allocation Meeting Minutes  Personal information withheld under section 7(2)(a). 
Appendix T – UV Project Pre-Construction Meeting Minutes  Personal information withheld under section 7(2)(a). 
Appendix U – UV Progress Meeting Minutes Recording Plan for Go, No-Go Personal information withheld under section 7(2)(a).
Appendix V – UV Channel No. 1 Isolation Permit to Work  Personal information withheld under section 7(2)(a). 
Appendix W – 21 & 28 October 2025 Inundation Events Incident Report   Personal information withheld under section 7(2)(a).
Appendix X – 15 January 2026 Inundation Event Incident Report  Personal information withheld under section 7(2)(a).
Appendix Y – 27 January 2026 Inundation Event Incident Report Personal information withheld under section 7(2)(a).
Appendix Z – 3 February 2026 Inundation Incident Report Personal information withheld under section 7(2)(a).
Please note : we are satisfied that the withholding of the information identified above is not outweighed by other considerations which render it desirable in the public interest to make the information available.

Crown Review Final Report

The failure of the Moa Point Plant on 4 February 2026 was one of the most significant infrastructure incidents experienced in Wellington in recent decades. Its consequences were immediate and far-reaching, affecting environmental outcomes, public confidence, essential service delivery, and the operation of a critical public asset.

The Crown Review Team was appointed to examine the governance, oversight, asset management, funding, contractual arrangements, and operational factors that may have contributed to the event. Our purpose was not to determine legal liability or undertake a technical fault investigation, but to identify the systemic lessons that must inform the future management of wastewater infrastructure across the Wellington region.

Read the Crown Review Final Report

View the Crown Review Flood Incident Graphic

Hydraulic report

Wellington Water Limited (Wellington Water) engaged Stantec to develop a steady state single phase
hydraulic model of the effluent pipelines, bypass system, and ocean outfall with the intention of
understanding how the bypass system could be operated during the recovery phase and to understand
the hydraulic constraints on the system once the treatment process was brought back online whilst the
UV Disinfection system upgrades are progressing.

Read the Hydraulic Report

View the Hydraulic Report graphic

Damage Assessment Report

A Beca multi-disciplinary team (mechanical and electrical/controls) undertook an assessment of the Moa St
WWTP on 20, 21 and 23 February 2026, in order to assess damage to assets after the plant was flooded on 4
February 2026. 

The Beca team was provided with a full list of assets for the site via Veolia, the treatment plant operator/maintainer. Veolia nominated the assets thatwere likely affected by the flooding to be those in the following areas:

  • Odour control room
  • Primary sludge pumps technical gallery and mezzanine floor area
  • Sludge transport pumps chamber
  • Service gallery
  • Blower room
  • Switchboard room
  • UV room (note that the UV room was initially restricted to access, however became available during
    the site inspection phase, and was included in the assessment).

Read the Damage Assessment report

View the Moa Point - Stages of Wastewater Treatment diagram