Wainuiomata North wastewater renewal
Tiaki Wai is currently relining existing wastewater pipes parallel to Frederick Street, as the current pipes are old, and in need of replacement to reduce the risk of pipe leaks and blockages.
If you have any questions about this work, please contact:
Tiaki Wai, 0800 TIAKI WAI (0800 842 549)
Latest Updates
Crews are making good progressing relining the wastewater (sewerage) pipe from Russell Road, to McKay Street, Wainuiomata.
We're about to start relining wastewater (sewerage) pipes from Russell Road to McKay Street in Wainuiomata, with work expected to start in mid-October, and be finished by the end of November 2026.
Unforeseen ground conditions have delayed the start date of works, meaning work will now start in October 2026 (instead of late June 2026)
Tiaki Wai is currently relining the wastewater pipes parallel to Frederick Street (shown in yellow, on the below image). The current pipes are old, and in need of an upgrade to reduce the risk of pipe leaks and blockages.
Here’s what to expect:
- Crews are expecting to start work in mid-October and be finished by around late November 2026 (indicative timeframe).
- The work involves the relining of existing wastewater pipes at the end of the cul-de-sacs – between McKay and Russell Road.
- Most of the work is on public land - accessing the manholes only at the end of the cul-de-sacs, with some work on private property (we’ll be in touch directly with any impacted private property owners).
- There’ll be some traffic management in place and parking limitations on these streets while the work takes place.
- The construction work will generate noise; we’ll work to minimise this as much as possible.
- All work will be completed within standard working hours, Monday to Friday 8am-5.30pm (crews will prep site from 7am).
- PipeWorks (part of Brian Perry Civil) is completing the work on the ground.
If you have any questions about this project, you can contact:
Donna Bencich, Project Manager, Pipeworks, 027 320 5148
After hours, please call the Hutt City Council Call Centre on 04 237 5089.
All Updates
Brian Perry Civil (Pipeworks) crews are partway through relining the wastewater pipe, having started from Russell Road, and making their way to Hunt Street. We're expecting this work to be completed by the end of next week, by Friday 6 November.
We then work on the lateral connections, which involves connecting the main pipe to lateral pipes that connect into people's homes.
A big thanks to residents for your patience and understanding while we complete this upgrade.
Earlier this year, we got in touch to let you know we’re replacing wastewater (sewerage) pipes in your area. This was originally scheduled for late May/June but unfortunately delayed due unforeseen ground conditions
We are now planning to replace these pipes in mid-October. As a reminder, we’re replacing the pipes and manholes parallel to Frederick Street. These assets are old and need to be replaced to avoid pipes blockages and leaks.
We’re replacing these pipes using a technique known as relining, which means we only need to access the manholes. We slip the new pipe in via the manhole, which generally avoids the need for open trenches/digging.
Here’s the key things you need to know:
· Crews will be in your area from mid-October until late November installing the new pipes and manholes (indicative timeframe).
· We will need to access manholes at the end of each cul-de-sac shown in the above map, including some work on private property (we’ll be in touch with impacted property owners).
· This will mean traffic management (partial road closures) and parking restrictions on these streets. Residents will still be able to access their properties.
· The construction work will generate noise; we’ll work to keep this to a minimum.
· All work will be completed within standard working hours, Monday to Friday 8am-5pm.
· Pipeworks crews (part of Brian Perry Civil) will be completing the work on the ground.
If you have any questions about this project including the day-to-day traffic management plan and impacts, you can contact:
Donna Bencich, Project Manager, Pipeworks, 027 320 5148
Got any questions? Here's who to contact
Phone: 0800 TIAKI WAI (0800 842 549)
Email: engagement@tiakiwai.co.nz
Project Reference: Wainuiomata North Wastewater Renewal
Unforeseen ground conditions have meant that crews are unable to complete relining works in June 2026.
We're now working towards starting work in mid-October 2026, and aim to complete the work by the end of November 2026.
Unfortunately, we're unable to start works in June 2026 having encountered unforeseen ground conditions.
We're now working towards starting works in mid-October 2026, and be completed by the end of November 2026.