Every year we carry out over 200 different projects in our four cities. These projects range from renewing a stormwater pipe in a single street to building a new reservoir. 

 

We are working hard to meet the region's growing water needs

Overview
Dashboard View
Map View
Clean well - Lyall Bay

Featured Projects

View All Projects

20200812 WW WellingtonWaterImagery 150

Harris St Syphon

Read More

pipe picture

Titahi Bay water main renewals

Read More

20200812 WW WellingtonWaterImagery 128

Murphy Street Overflow

On behalf of Wellington City Council we are investigating ways to reduce surface flooding on Murphy Street.

Read More

Project Updates

Tōtara Park Road Bridge Pipework Seismic Strengthening
Last updated: Mar 24, 2026, 9:11 AM
Crews have started on the first phase of works, which involves installing a water pipe (known as a ridermain) along Clouston Park Road and Tōtara Park Road
Harris St Syphon
Last updated: Mar 23, 2026, 4:05 PM
Now that’s what we call a deep clean!

Constructed over twenty years ago to address stormwater flooding in the CBD, the Harris Street syphon sits 16 metres under ground level. It’s meant to drain stormwater from around Willis and Victoria Streets and discharge it, using its own momentum, at Frank Kitts Park.
Takapū Road Watermain Renewal
Last updated: Mar 23, 2026, 2:58 PM
Delivered under the Urgent Works stream as part of our Capital Delivery Programme, our internal Major Pipelines, Operations, and Design teams have been working collaboratively to unearth sections of the bulk water main (that is, the big pipes) which carries drinking water from Te Mārua Treatment Plant in Upper Hutt to Porirua City and the western suburbs of Wellington City.
Newlands Watermain Renewals
Last updated: Mar 23, 2026, 9:56 AM
Ngauranga Gorge project
Last updated: Mar 13, 2026, 4:03 PM
Work will soon be working to install an earthquake resilient pipe connection at Ngauranga Gorge. This key pipeline brings water from Hutt Valley to Wellington City. Work is scheduled to start on 23 March and completed by 20 July.

Seaview Wastewater Treatment Plant Upgrades
Last updated: Feb 13, 2026, 11:24 AM
Eastern Hills Reservoir, Lower Hutt
Last updated: Feb 10, 2026, 4:47 PM
Geotech investigations have started along the Summit Road Firebreak and close to Balgownie Grove in Fairfield, Lower Hutt to inform the design of the Eastern Hills Reservoir.
Western Wastewater Treatment Plant Refurbishment Projects
Last updated: Feb 2, 2026, 9:49 AM
The works to renew the current UV system at Western started as planned in January
Victoria Street Wastewater Rising Main
Last updated: Jan 16, 2026, 1:17 PM
Our contractors will be doing investigative work before the renewal of the 1936 wastewater pipe which runs along Victoria Street and Dixon Street.  
Cockayne Road water pipe renewal
Last updated: Jan 15, 2026, 9:41 AM
Works commenced at Cockayne Road and Imlay Crescent on Monday 12 January, with our contractors G P Friel Ltd excavating each end of the pipe to prepare it for cleaning.

Upcoming

21

In Progress

38